TowerScope
Facilities / U90

Tucson Approach U90

Tucson Approach (U90) is the approach and departure control facility that public NASR records list as the primary approach control for 5 airports, 3 of them with a control tower. Pilots call it "Tucson Approach".

Airports it serves (5)

AirportCityTower
Davis Monthan Air Force Base (KDMA)Tucson, AZTower (page)
Ryan Field (KRYN)Tucson, AZTower (page)
Tucson International Airport (KTUS)Tucson, AZTower (page)
Marana Regional Airport (KAVQ)Marana, AZNo tower
Nogales International Airport (KOLS)Nogales, AZNo tower

Pay level

The FAA rates this facility level 8 on its scale of 4 to 12. Busier, more complex facilities get higher levels, and higher levels pay more. A fully certified controller at a level 8 facility was paid between $92,723 and $125,176 a year in 2025, before the local cost-of-living addition. Overtime, night and Sunday pay come on top.

Level: National Academies (2025), The Air Traffic Controller Workforce Imperative, Appendix C, Table C-2, which reproduces FAA data with staffing as of September 23, 2023; the FAA may have changed the level since. Pay range: FAA pay band table effective January 12, 2025, as posted by NATCA.

Source

FAA National Airspace System Resource (NASR) data, 28-day cycle effective 2026-10-01 (FAA NASR subscription). Facility data changes every 28 days; check current FAA publications before flight.

Public records, summarized in plain language. Not for navigation or operational use. Privacy: no cookies, no tracking.