TowerScope
Facilities / LCH

Lake Charles Approach LCH

Lake Charles Approach (LCH) is the approach and departure control facility that public NASR records list as the primary approach control for 6 airports, 1 of them with a control tower. Pilots call it "Lake Charles Approach".

Airports it serves (6)

AirportCityTower
Chennault International Airport (KCWF)Lake Charles, LATower (page)
De Quincy Industrial Airpark (5R8)De Quincy, LANo tower
Jennings (3R7)Jennings, LANo tower
Lake Charles Regional Airport (KLCH)Lake Charles, LANo tower
Southland Fld (KUXL)Sulphur, LANo tower
Welsh (6R1)Welsh, LANo tower

Pay level

The FAA rates this facility level 6 on its scale of 4 to 12. Busier, more complex facilities get higher levels, and higher levels pay more. A fully certified controller at a level 6 facility was paid between $75,939 and $102,516 a year in 2025, before the local cost-of-living addition. Overtime, night and Sunday pay come on top.

Level: National Academies (2025), The Air Traffic Controller Workforce Imperative, Appendix C, Table C-2, which reproduces FAA data with staffing as of September 23, 2023; the FAA may have changed the level since. Pay range: FAA pay band table effective January 12, 2025, as posted by NATCA.

Source

FAA National Airspace System Resource (NASR) data, 28-day cycle effective 2026-10-01 (FAA NASR subscription). Facility data changes every 28 days; check current FAA publications before flight.

Public records, summarized in plain language. Not for navigation or operational use. Privacy: no cookies, no tracking.