TowerScope
Facilities / GSO

Greensboro Approach GSO

Greensboro Approach (GSO) is the approach and departure control facility that public NASR records list as the primary approach control for 12 airports, 1 of them with a control tower. Pilots call it "Greensboro Approach".

Airports it serves (12)

AirportCityTower
Smith Reynolds Airport (KINT)Winston Salem, NCTower (page)
Asheboro Regional Airport (KHBI)Asheboro, NCNo tower
Blue Ridge Airport (KMTV)Martinsville, VANo tower
Burlington Alamance Regional Airport (KBUY)Burlington, NCNo tower
Causey (NC74)Liberty, NCNo tower
Davidson County Executive Airport (KEXX)Lexington, NCNo tower
Meadow Brook Fld (N63)Walnut Cove, NCNo tower
Mount Airy Surry County Airport (KMWK)Mount Airy, NCNo tower
Piedmont Triad International Airport (KGSO)Greensboro, NCNo tower
Rockingham County NC Shiloh Airport (KSIF)Reidsville, NCNo tower
Siler City Municipal Airport (KSCR)Siler City, NCNo tower
Twin Lakes (8A7)Mocksville, NCNo tower

Pay level

The FAA rates this facility level 8 on its scale of 4 to 12. Busier, more complex facilities get higher levels, and higher levels pay more. A fully certified controller at a level 8 facility was paid between $92,723 and $125,176 a year in 2025, before the local cost-of-living addition. Overtime, night and Sunday pay come on top.

Level: National Academies (2025), The Air Traffic Controller Workforce Imperative, Appendix C, Table C-2, which reproduces FAA data with staffing as of September 23, 2023; the FAA may have changed the level since. Pay range: FAA pay band table effective January 12, 2025, as posted by NATCA.

Source

FAA National Airspace System Resource (NASR) data, 28-day cycle effective 2026-10-01 (FAA NASR subscription). Facility data changes every 28 days; check current FAA publications before flight.

Public records, summarized in plain language. Not for navigation or operational use. Privacy: no cookies, no tracking.